PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Stone panels at the East Elevation 1.jpg Installing Stone panels at the East Elevation 2.jpg Laying out block at the 1st floor EMR Room Facing South.jpg Erecting the stone panels at the East Elevation.jpg Installed duct work hangers at the 4th floor Facing North.jpg Installing Sheathing at the 4th floor Electical Room Facing West.jpg Metal Framing at the UCIA 2nd floor Facing North.jpg Stone panel is not installed Facing North.jpg
Previous pageNext page Installed duct work hangers at the 4th floor Facing North
Installed duct work hangers at the 4th floor Facing North